<div dir="ltr">We have a single ESS GL6 system running GPFS 4.2.0-1. Last night one of the IO servers phoned home with memory error. IBM is coming out today to replace the faulty DIMM.<div><br></div><div>What is the correct way of taking this system out for maintenance?</div><div><br></div><div>Before ESS we had a large GPFS 3.5 installation with 14 IO servers. When we needed to do maintenance on the old system, we would migrate manager role and also move primary and secondary server roles if one of those systems had to be taken down. </div><div><br></div><div>With ESS and resource pool manager roles etc. is there a correct way of shutting down one of the IO serves for maintenance?</div><div><br></div><div>Thanks,</div><div>Damir</div></div>